Rudder box
With the gantry in place it was time to start building the lifting rudder head mechanism. Lifting firstly because I have kids and there is a beach in the harbor at low tides. Secondly because there are some lakes and bays I plan on sailing from where it will come in handy.
This piece gave me some angst but with it 70% complete now I'm fairly confident it'll work well enough to get me sailing. My assumption is I'll be rebuilding some areas once we start sailing but really hoping to focus on the foils.
As with most of Farrout I approached this with a mixture of 4mm mahogany ply, cedar and carbon / glass / epoxy.
It all starts with a dry fit.
This piece gave me some angst but with it 70% complete now I'm fairly confident it'll work well enough to get me sailing. My assumption is I'll be rebuilding some areas once we start sailing but really hoping to focus on the foils.
As with most of Farrout I approached this with a mixture of 4mm mahogany ply, cedar and carbon / glass / epoxy.
It all starts with a dry fit.
Epoxied in some cedar
Checking rudder fit
Checking fit against the gantry
Testing fit with both sides against the rudder.
Some reinforcement on the rudder
Bagging the rudder box
Starting to get there. The tube on top was made by wrapping some carbon around the 1" carbon tube I'm going to use for a tiller
Finally see the whole thing together
Quick break to tape the deck edges. Reading about Dave's split seam early on and considering my likely excursions on the pacific with a lee shore I figure it's worth a little reinforcement here.
Rudder box sides glued and some carbon tube to act as an hinge
Carbon tube with the 3/16" SS rod through
And glued in place with a bunch of mushed up carbon strands epoxied around it. Going to finish up with an extra layer of carbon over the top of the whole thing to beef it up a bit more.
Is it straight? Not sure. Hopefully straight enough!
It's not straight btw but it'll do. Want to go sail and can come back and rebuild areas later if I'm really not happy (fair chance of this area getting a second pass next year!)
ReplyDelete