Getting ready for the decks

Carlins installed

Drain holes, 3/4" seem a bit big but will seem smaller when the deck and hardware is all added.
Forward bulkheads (not in plan) just fitted in one of my scarf joint fails.

Bevelling the deck support on the forward hatch.

Using a batten to position/shape/bevel the support for the deck.


Forward bulkheads in place

And with deck / side deck supports, access holes and the side decks all ready to seal.

I should mention at this point that I'd advise sealing the hull sheets prior to attachment. Looks like it'll take me six back breaking hours to get all this sealed :(

Comments

Popular posts from this blog

Mounting the Frames Part II

Fairing

Step 1. Get bits sorted out.

Album